Pump House – Castleford>
Working closely with a sprinkler system installation company we were asked to design a building that was to sit between 2 large water tanks at a large distribution centre for a major online retail company>
Pump House – Castleford>
Working closely with a sprinkler system installation company we were asked to design a building that was to sit between 2 large water tanks at a large distribution centre for a major online retail company>>
Our brief was to design a building to house the large boiler that could have one side temporarily dismounted so that the boiler could be slid in on a sledge system>
Boiler House – Sheffield>
Our brief was to design a building to house the large boiler that could have one side temporarily dismounted so that the boiler could be slid in on a sledge system> >
Designed by client, Hanson’s scope of works was to design, supply and install a functional build within a required budget. The buildings main purpose was to be used as a valeting bay >
Valeting Bay - Swindon>
Designed by client, Hanson’s scope of works was to design, supply and install a functional build within a required budget. The buildings main purpose was to be used as a valeting bay >
Designed by client, Hanson’s scope of works was to design, supply and install a functional build within a required budget. The buildings main purpose was to be used as a valeting bay. >
Valeting Bay – Cheshire>
Designed by client, Hanson’s scope of works was to design, supply and install a functional build within a required budget. The buildings main purpose was to be used as a valeting bay >