Overview

Working closely with a sprinkler system installation company we were asked to design a building that was to sit between 2 large water tanks at a large distribution centre for a major online retail company.

The building had to achieve 1 hr fire protection so that the pumps were protected should a large fire take hold in the main building.

The programme was critical as the sprinkler system had to be installed and commissioned prior to the building handover to the client. We had to work within very strict installation dates so co-operation between all parties was crucial to ensure that the installation was finished on time.

Due to the number of pipe/vent/flue penetrations, we worked closely with the engineers to form the necessary openings in the walls as the pump installation progressed. All holes were then flashed and sealed internally and externally to give a neat, water tight finish.

Building Spec

Structure Size: 8.8m x 7.3m x 3.4m (2 bays)

 Colour: Goosewing Grey BS10A05

Roof Type: Apex

 Cladding: Kingspan KS1000 Micro Rib 45mm core Vertical

Doors: 1 x Double Steel PA door

Insulation Level: 40mm

amazon steel building

Project Details

LOCATION

Castleford

BUILDING TYPE

Pump House

CLIENT

Client (Nu-Form Fire UK) / Hanson collaboration

DESIGNER

Hanson’s

START DATE

August 2022

HANDOVER

August 2022

Project Gallery

amazon steel building
pump house building
steel buildings